Laserfiche WebLink
Test Method Developed By: <br />Test Method Used: <br />Piping Manufacturer 0 Industry Standard in Professional Engine <br />0 Other Sr, <br />Z Pressure 0 Vacuum 0 Hydrostatic <br />0 Other (Specify) <br />l� Test Equipment Used: PRESSURE GAUGE IN PSI NITROGEN <br />Equipment Resolution: 1/18 — 15 PSI <br />FORNE <br />1 4 sma <br />MIMI <br />6.0 <br />ii Piping Material: <br />iping un # <br />Piping Manufacturer: <br />F <br />ii Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />Method and location of <br />Y ipin�nm isolation: <br />ISOLATION B OT <br />ISOLATIO BOOT <br />i <br />Wait time between applying <br />pressure/vacuum/water and <br />Test Start Time: <br />Test End Time: <br />Final Reading (RF):������.®� <br />est Duration <br />�I r. <br />Change in Reading (RF-Ro- <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result. -- <br />J" <br />UMA 1- 9 -4 K t 9 141-1) <br />1 I -MI <br />2 <br />-33MM <br />