Laserfiche WebLink
SWRCB, January 2002 <br />9. Spl]LIjOVERF]ILL COPOMNT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes 0 <br />Spill/Overfill Containment Boxes are Present, but were Not Tested 1:1 <br />Test Method Developed By: 0 Spill Bucket Manufacturer ❑Industry Standard <br />0 Other (Specify) <br />Test Method Used: 0 Pressure 0 Vacuum <br />0 Other (Specify) <br />Page _ of — <br />El Professional Engineer <br />0 Hydrostatic <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />SPILL BUCKETS IESTED- ON MO ITOR CERT, - <br />MAT' 2 7 "115 <br />1 5a <br />