Laserfiche WebLink
0 <br />ity empjoyees have received the requi, <br />itempjoyees hired within the past 30 <br />y <br />.t a job training within the past year. <br />rave received the required on the job train <br />Y <br />x01-15-13 <br />Monitoring system certification (within past j' Wirth <br />I Bucket testing completed (within past 12 months) X <br />De[ector-mechanicalfejectronje iar most sites (within past 12 months) <br />The above are usually acute togetlac r on an ammaTThasis for local regu/atnr. <br />Line Tightness (usually upon construction or when ao positive shutdown) <br />N NA <br />— <br />— <br />Date Done <br /># <br />o <br />f <br />Tank, Tiehtness tL°suallti onl} atter construction or when usingSIR) <br />Secondx) containment (SB989) tests Have been completed (usually every 3 years) X <br />f <br />(J A" ""'ng or --i- 8patlCe cog3lelf b/ 1IS required.. IhP,171 Mow: <br />""'ng or <br />esL' AQ X <br />— <br />7-2-I 2 <br />TestMaintenanee: <br />Test'Mainteoance: <br />31111111MM7 <br />used Designated Operator <br />ler or operator, but not to State Water Resources, <br />on discovered during, the tnOnthly <br />F and any attachments for the <br />local agency, off-site at a read <br />