My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1001
>
2300 - Underground Storage Tank Program
>
PR0231876
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 11:39:52 AM
Creation date
6/3/2020 9:54:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231876
PE
2361
FACILITY_ID
FA0000421
FACILITY_NAME
DINO MART
STREET_NUMBER
1001
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1001 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231876_1001 E YOSEMITE_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mai 23 13 06»44a Elit IV Contactors 12094C 6342 p.4 <br />SWRCB, January 2002 <br />. Page � oi� <br />5. BE <br />C(iNDAR' PIPE TESTiNG <br />:TestMethod Developed.Hy:.Q�'ipivr-NfMiacturer:• Ind�rstryStancxi U Proft:ssional"Erigitieer = <br />0 Other (Specify) <br />Test -Method Used: `>?ressure., 0 Vacuum 4#- <br />ostatic <br />0 Other (��n # S'� Piping Run# pipio Piping Run # <br />" in- 9 9(drial: <br />m g blantfacturer.ing <br />DiameteL:ngth <br />of Piping Run <br />k <br />duct Stored:thod <br />and location of <br />p!ping-runn isolation: <br />`Wait time between applying <br />`pressurelvacuum/water and <br />starting test <br />! <br />Test Start Time: <br />_ <br />Initial Reading (&): <br />p� — <br />Test End Time: <br />'Final Reading.(Rp): <br />Test Duration: <br />— <br />Change in heading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />1 , <br />comments — (include information on repairs made prier to testing and recommended :'a. c w -u ar aided tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.