My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_1987-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 2:13:15 PM
Creation date
6/3/2020 9:54:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2006
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_1987-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQLWCOUNTY ENVIRONMENTAL HEALTIWPARTMEN't' <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 1 <br />TYPE OF ACTION 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION <br />M01. <br />PLAN TYPE KMONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />M02. <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />1. FACILITY INFORMATION ; <br />FACILITY ID # (Agency Use Only) <br />-"' <br />FACILITYNAME <br />M03. <br />Moo. CITY <br />FACILITY SITE ADDRESS <br />Mos. <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE` <br />State law requires that testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) be performed in <br />instructions, or annually, whichever is more frequent. Such work must be performed by qualified personnel. <br />MO <br />accordance with the equipment manufacturers' <br />MONITORING EQUIPMENT IS SERVICED ® 1. ANNUALLY ❑ 99. OTHER (Specify): <br />MO <br />III. MONITORING LOCATIONS - <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed (i.e., location of each sensor, <br />If already have a diagram (e.g., current UST Monitoring Site Plan from a Monitoring System Certification <br />line leak detector, monitoring system control panel, etc.). you <br />form, Hazardous Materials Business Plan map, etc.) which shows all required information, include it with this plan. <br />IV. TANK MONITORING <br />M10. <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />2.1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />M"SECONDARY <br />CONTAINMENT IS: f 5I a. DRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE /n� E] d. UNDER VACUUM <br />M12. MODEL #: J 2.2 1 _ � <br />Mia. <br />PANEL MANUFACTURER: Ti `� �.�e �, <br />-LIQ <br />M1s. <br />Mla. MODEL#(S): � �� <br />LEAK SENSOR MANUFACTURER: , t <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TA MK(S) <br />M17. <br />PANEL MANUFACTURER: MODEL #: <br />M19. <br />Mlg. MODEL #(S): <br />IN -TANK PROBE MANUFACTURER: <br />Mzo. <br />LEAK TEST FREQUENCY: Ela. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />M21. <br />e. OTHER (Specify): <br />❑ d. MONTHLY Elp Y)' <br />M22. <br />M23. <br />PROGRAMMED TESTS: [Ia. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): <br />❑Mza. <br />3. INVENTORY RECONCILIATION Ela. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />MzS. <br />TESTING PERIOD: [I a. 36 HOURS ❑ b. 60 HOURS <br />❑ 5. INTEGRITY TESTING PER 23 CCR §2643.1 M26 <br />M27 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): <br />6.VISUAL MONITORING DONE: ❑ a. DAILY b. WEEKLY (Requires agency approval) <br />M12 8. <br />❑ 99. OTHER (Specify): <br />V. PIPE MONITORING <br />M30 <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />IS;1. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />M31 <br />SECONDARY CONTAINMENT1S: t � a. DRAY 1 ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE/ ❑ d. UNDER VACUUM <br />{ *�' M32 MODEL #: i �ZZ S 6 <br />M33 <br />PANEL MANUFACTURER: �� \ 4 <br />1 �5. <br />LEAK SENSOR MANUFACTURER: 1, M34. MODEL #(S): 24 <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? ❑ a. YES ® b. NO <br />M36 <br />WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES R b. NO <br />M3" <br />2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK ISD E( TED M38 MODEL #(S): <br />M39. <br />MLLD MANUFACTURER(s): <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS <br />Mal. <br />Mao. MODEL #: <br />ELLD MANUFACTURER: <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. <br />M42. <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN. 11a. YES ❑ b. NO <br />M43.Maa <br />WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES El b. NO <br />❑ 4. INTEGRITY TESTING M45. <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) <br />M46. <br />�] 5.VISUAL MONITORING DONE: ❑ a. DAILY (8 b. WEEKLY* ❑ c. MIN. MONTHLY & EACH TIME SYSTEM OPERATED" M47. <br />• Requires agency approval •• Allowed for monitoring of unburied emergency generator fuel piping only per HSC §25281.5(bx3) <br />❑ 6. PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(a)(3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />Mas. <br />LJ yy. U 1 nctc kapccuy) <br />07/23/03 <br />SJCEHD-d (07/03) -1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.