My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_1987-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 2:13:15 PM
Creation date
6/3/2020 9:54:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2006
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_1987-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ik110'VITORING .. <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring <br />program are conditions of the operating permit. The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br />procedures, unless required to obtain approval before making the change. <br />Required by Sections 2632(d) and 2641(h) CCR. <br />Facility Name Bank of Stockton Corporate Hangar #3 <br />Facility Address Stockton Metropolitan Airport5000 Lindbergh <br />A. Describe the frequency of performing the monitoring: <br />Tank Constantly: Continuous electric <br />Piping Constantly: Continuous electric/mechanical <br />B. What methods and equipment, identified by name and model, will be used for <br />performing the monitoring: <br />Tank TLS -250 Veederroot Pollulert FD-221-6/TRA <br />Piping Pollulert FD-221-6/TRA <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan <br />should be attached): <br />Is attached <br />D. List the name(s) and title(s) of the people responsible for performing the monitoring <br />and/or maintaining the equipment: <br />Norman L. White <br />E. Reporting format for monitoring: <br />Tank Tape and Alarm <br />Piping Alarm <br />F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />but not less than every 12 months: Stockton Service Station Supply <br />G. Describe the training necessary for the operation of UST system, including piping, <br />and the monitoring equipment: Not required <br />
The URL can be used to link to this page
Your browser does not support the video tag.