Laserfiche WebLink
Ik110'VITORING .. <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring <br />program are conditions of the operating permit. The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br />procedures, unless required to obtain approval before making the change. <br />Required by Sections 2632(d) and 2641(h) CCR. <br />Facility Name Bank of Stockton Corporate Hangar #3 <br />Facility Address Stockton Metropolitan Airport5000 Lindbergh <br />A. Describe the frequency of performing the monitoring: <br />Tank Constantly: Continuous electric <br />Piping Constantly: Continuous electric/mechanical <br />B. What methods and equipment, identified by name and model, will be used for <br />performing the monitoring: <br />Tank TLS -250 Veederroot Pollulert FD-221-6/TRA <br />Piping Pollulert FD-221-6/TRA <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan <br />should be attached): <br />Is attached <br />D. List the name(s) and title(s) of the people responsible for performing the monitoring <br />and/or maintaining the equipment: <br />Norman L. White <br />E. Reporting format for monitoring: <br />Tank Tape and Alarm <br />Piping Alarm <br />F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />but not less than every 12 months: Stockton Service Station Supply <br />G. Describe the training necessary for the operation of UST system, including piping, <br />and the monitoring equipment: Not required <br />