Laserfiche WebLink
Facilitz': Bank of Stockton, Airport <br />Piping Sump <br />19. Inspect piping sump for <br />damage. Is piping sump <br />d.n- ani free of debris? <br />20. Inspect submersible pump <br />for damage. Are electrical <br />connections to pump bode <br />secure? Is flexible hose <br />properly connected from <br />pump to product line? <br />211. Inspect dual -wall product <br />piping entre into sump. <br />Will outer piping alio <br />u- <br />product leaking from inner <br />piping to drain into sump? <br />Date: 1/8/01 <br />Capacity Product YES NO N/A Remarks <br />X <br />i <br />X <br />X <br />X <br />PAGE 8 <br />