Laserfiche WebLink
.wry= <br />�J <br />E <br />Annual Inspection Rw' !' <br />Facility: Bank of Stockton, Airport <br />Monitoring Console Capacity Product YES NO N/A <br />7. Verify that batten backup <br />is functioning properly by <br />powering unit down and <br />back up again using only <br />circuit breaker panel. Is <br />programming lost when <br />power is restored to unit? <br />8. Are circuit breaker panel X <br />and associated conduits <br />securely mounted? <br />9. Are monitoring console. X <br />submersible pump, and <br />suction pump wired on <br />separate circuit breakers? <br />Are circuit breakers sized <br />correctl- far load capacin" <br />PAGE 4 <br />Date: 1 / 8 / o i <br />