Laserfiche WebLink
NEW U <br />.AGILITY NAME: <br />ALLATION INSPECTION <br />ADDRESS: @- Zn tT Ary <br />ULS TANK MODEL/MATERIMODEL/MATERI : <br />(CAPACITY: PRODUCT: R.E.H.S: I <br />INITIAL INSPECTIONS <br />A <br />p <br />I <br />M <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />VACUUM: SOAP: PSI: HRS/MIN: BRIME(LIQUID ANNULAR): OTHER: <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />4. PRIMARY TANK TEST: PSI: HRS/MIM: <br />R <br />T <br />8.111jrX TEST ON ALL SUMPS (24 HR_ MINIMUM) HRS: (CCR 2635 (A)) <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />0 <br />I <br />9.- UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br />V <br />A <br />10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br />E <br />L <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br />D <br />S <br />18. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) (CCR 2631 (D) (5)) <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />20. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 7632 (E) Cl) (2)) <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br />2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br />INITIAL INSPECTIONS <br />PIPING INSPECTIONS <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIN: BRIME(LIQUID ANNULAR): OTHER: <br />7.1L SECONDARY PIPING CONTAINMENT TEST PSI: HRS/HIN: OTHER: (CCR 2635 (A) (4)) <br />4. PRIMARY TANK TEST: PSI: HRS/MIM: <br />8.111jrX TEST ON ALL SUMPS (24 HR_ MINIMUM) HRS: (CCR 2635 (A)) <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />PIPING INSPECTIONS <br />FINAL INSPECTION <br />6.16 PRIMARY PIPING TEST (HIMINUM 40 PSI/30 HIM) (CCR 2635 (B) (4)) <br />7.1L SECONDARY PIPING CONTAINMENT TEST PSI: HRS/HIN: OTHER: (CCR 2635 (A) (4)) <br />8.111jrX TEST ON ALL SUMPS (24 HR_ MINIMUM) HRS: (CCR 2635 (A)) <br />9.- UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br />10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br />FINAL INSPECTION <br />COMMENTS <br />EH23-006 3/92 (REVISED 11\92) <br />F.j <br />12. PERFORMANCE TEST FOR •ALL• MONITORING PROBES (CCR 2632 (C) (2)) <br />13. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br />14. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (B) (5)) <br />15. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCN 2635 (B) (5)) <br />16. BALL FLOAT VALVES INSTALLED (CCR 2635 (B) (6)) <br />17. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (E) (2)) <br />18. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) (CCR 2631 (D) (5)) <br />19M TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br />20. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 7632 (E) Cl) (2)) <br />21. •C' FORM COMPLETED AND SUBMITTED (CCR 2635 (E)) <br />22. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2641-2644) <br />23. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284 (E) (F)) <br />COMMENTS <br />EH23-006 3/92 (REVISED 11\92) <br />F.j <br />