Laserfiche WebLink
SWRCB.January 2002 <br /> Page 3 of 7 <br /> Job: Bank of Stockton,Airport <br /> 1941 E.Lockheed Ct. <br /> Stockton,CA 95206 <br /> Date: June 20,2006 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: [ ]Piping Manufacturer [X]Industry Standard [ ]Professional <br /> Engineer <br /> [ ]Other(Spec) <br /> Test Method Used: [X]Pressure [ ]Vacuum [ ] Hydrostatic <br /> ]Other(Spec) <br /> Test Equipment Used:Pressure Gauge Equipment Resolution: 0.20 <br /> Piping Run Piping Run Piping Run Piping Run Piping Run <br /> SUCTION RETURN VENT <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: A.O. Smith A.O. Smith A.O.Smith <br /> Piping Diameter: 6-4 4-3 2-3 <br /> Length of Piping Run: 85 ft. 85 ft. 85 ft. <br /> Product Stored: Jet-A Jet-A <br /> Method and location of <br /> piping-run isolation: Boot Dispenser Test Boot Test Boot <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 9:00 A.M. 9:00 A.M. 9:00 A.M. <br /> Initial Reading(R1) 5 P.S.I. 5 P.S.I. 5 P.S.I. <br /> Test End Time: 9:30 A.M. 9:30 A.M. 9:30 A.M. <br /> Final Reading(Rf): 5 P.S.I. 5 P.S.I. 5 P.S.I. <br /> Test Duration: '/Z HOUR '/:HOUR '/2 HOUR <br /> Change in Reading(Rf-RI) -0- -0- -0- <br /> Pass/Fail Threshold or -0- -0- -0- <br /> Criteria: <br /> Test Result: [X]Pass[]Fail I [XI Pass [ I Fail [X] Pass [ I Fail [' I Pass j I Fail [ ].Pass [ I Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />