Laserfiche WebLink
SWRCB.January 2002 Page 7 of 7 <br /> Job: Bank of Stockton,Airport <br /> 1941 E.Lockheed Ct. <br /> Stockton,CA 95206 <br /> Date: June 20,2006 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes { ] <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested [ ] <br /> Test Method Developed By: [ ]Spill Bucket Manufacturer [X]Industry Standard [ ]Professional Engineer <br /> �] <br /> Other_(Specify) <br /> Test Method Used: [ ]Pressure [ ]Vacuum [X]Hydrostatic <br /> Other S eci <br /> Test Equipment Used: Caldwell Equipment Resolution: 1/32" <br /> Spill Bax Sill Box Spill Box <br /> Bucket Diameter: 12 INCH <br /> Bucket Depth: 14 INCH <br /> Wait time between <br /> applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 1:00 P.M. <br /> Initial Reading 1): 12 INCH <br /> Test End Time: 2:00 P.M. <br /> Final Reading(Rf): 12 INCH <br /> Test Duration: ONE HOURI <br /> Chane in Reading(Rf-RI) -0- <br /> Pass/Fail Threshold or PASS <br /> Criteria: <br /> Test Results Pass [ ] FailPass I I Fail Pass [ ], Fail Pass Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />