My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_1987-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 2:13:15 PM
Creation date
6/3/2020 9:54:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2006
RECORD_ID
PR0231891
PE
2361
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
1941 E LOCKHEED CT
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231891_1941 E LOCKHEED_1987-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 24, 2005 <br />kBLISHED 1867 <br />BANK OF <br />COMMERCIAL • CONSUMER • SAVINGS • TRUST <br />P.O. BOX 1 1 10 • STOCKTON, CALIFORNIA 95201 <br />Mr, Ray Von Flue <br />San Joaquin County <br />Environmental Health Department <br />304 E. Weber Ave. Third floor <br />Stockton, CA 95202-2708 <br />ReportRE: Monitoring <br />Dear Mr. Von Flue <br />Enclosed you will find the copies of the modified monitoring report we discussed today. <br />Construction began on February 15 2005. On February 11 our last fueling occurred <br />before construction. At this time, after pumping to a minimum level in the tank, we <br />removed the above ground equipment (filter, metering and hose assembly) and had the <br />pipes capped. We have not added to or removed fuel from the tank since this time. <br />Our wonderful wet spring create serious delays in our project. Concrete was finally <br />poured in May. Unfortunately, problems required the slag to be removed-. We are still <br />waiting for the re -pour. <br />I have continued to stick the tank to insure constant level. If anything else is needed. <br />Please let me know. <br />Believe me, I look forward to getting the new system in place as soon as poss <br />Thanks for all your help over the past years, and good luck in you new position.. <br />7w�-- <br />Norman <br />L White <br />V.P. Chief Pilot <br />Encl. <br />
The URL can be used to link to this page
Your browser does not support the video tag.