Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Box is Present,but was Not Tested X <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> 0010mm Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: Tn` <br /> r-�-,,f" <br /> Test Start Time: <br /> Initial Reading(RI): 7 t <br /> Test End Time: <br /> Final Reading(RF): ° 'u';w ad',a A <br /> Test Duration: <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />