Laserfiche WebLink
F. In-Tank Gauging 1 SIR Equipment: X Check this box if tank gauging is used only for inventory control. <br /> U Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes u No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes a No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes [:i No* Was accuracy of system product level readings tested? <br /> Yes ❑ No* Was accuracy of system water level readings tested? <br /> Yes ❑ No* Were all probes reinstalled properly? <br /> Yes a No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): (X)Check this box if LLDs are not installed. <br /> Complete the followring checklist: <br /> Yes n No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> 0 N/A that apply) Simulated leak rate: ❑3 g.p.h.; ❑0.1 g.p.h; u 0.2 g.p.h. <br /> Yes a No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes n No* Was the testing apparatus properly calibrated? <br /> Yes n No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> u N/A <br /> Yes 0 No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> N/A disconnected? <br /> Yes in No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctionsor <br /> N/A fails a test? <br /> Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> n N/A <br /> Yes 0 No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,Flow,describe how and when these deficiencies were or velli be corrected. <br /> H. Comments: SAFE SUCTION SYSTEM <br /> Nny 1 2016 <br /> y► N MT <br /> AL <br /> w eve, <br /> EPA <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 2/21/07 <br />