My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_1985-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 3:59:23 PM
Creation date
6/3/2020 9:54:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1997
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_1985-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND TANK. INSPECTION RECORD <br /> NEW TANK INSTALLATION <br /> SITE NAME INSPECTOR'S NAME <br /> ADDRESS Y ZIP <br /> '•CONTRACTORr NAME TELEPHGiE <br /> OWNER: NAME TELEPHONE <br /> DIS- INSPECTOR' <br /> DATE APPROVED APPROVED INITIALS <br /> -- <br /> ITEM OR EQUIPMENT INSPECTED <br /> e I- fees nald- <br /> INITIAI. INSPECTION <br /> 1. tank tested u22n delivery jHnIIdaylasteel) or air SPSI (FRP) <br /> 2. Visual inspection of secondary containment. <br /> 3. Tank appropriately placed with apprnved backfill. <br /> 4. UL numbers and tank capacities recorded. <br /> PIPING STAGE INSPECTION <br /> 1. Pressure test of piping. [Primary and Secondar (NEPA O)) <br /> 2. Sall float valves installed. <br /> 3. Overfill protection installed, descritrd: <br /> s _ <br /> A. Unused tank openings sealed and cathodicelly protected. <br /> S. Visual inspection of secondary containment on pipjng, <br /> (tockable wather prop <br /> ?Jonitaring Ports In a an brought to rade. covers <br /> 7. Fill and vent piping brought to grade. <br /> 8. Prnduct line leak detector in place. (Hard wired) <br /> 9. Approved tank leak monitoring device installed. <br /> LO. All galvanized piping and fittings Eroperly wra d. <br /> 1. Pressure decaytest on complete tankandproduct deliver s stem�S <br /> FINAL INSPECTION <br /> 1.' Precision .test successfullyc.+m )eted and hard cotes received--!St <br /> 7. Spill jOrotection at fill .i .e. <br /> L - 3. Performance test'of ncerf111 litutect.imr rvstem. <br /> 4. Performance test of poodAers line leak detectot. (Hard wired) <br /> S. Performance test of c•)ntinuuu:: s.n.itorinr system(s) an tank(s)� �^tt <br /> b. Petmit to operate a l icat ion tom.rete. <br /> 7. Acceptable recordkeepitig system. <br /> cottfxrs: <br />
The URL can be used to link to this page
Your browser does not support the video tag.