Laserfiche WebLink
777�iMonitoring Sys -ten -i -Certification <br />9 4 Its <br />'M <br />17-1 W-3 It I I Z -7 -MV -5 7777,g Z <br />gair Mj=—Wer�ta-nk­ia-u-g-ing probes visually inspected for.damage and residue <br />Was acY .. of system, product level readings tested? <br />IqWV_Wj=:I Was accuracy of system water level readings tested? <br />I RK <br />Were all items on the'equipmmtti. nufadfiremaintenanc,-AwMist completed? <br />MA to <br />IL Comments: <br />cc? <br />For equipment start-up or annual - q[uiP`ke7nt certification, was a leak simulated to verify LLD P.rfbrmanis <br />(Check 0 tharapply) Simulated leak ratez 'M 3. g-pJL); Cl 0-1 kp.IL2-, 0 02 &p -h-' <br />-Nottis: L Required for ocltitipmedt start-up cerfificafion and annual certification. <br />-2.'Untess mandated by local agency, certificaton requh-ed only for electronic LLD start-up.. <br />D?q <br />I <br />TotmechanicalLLI)s, does the LLD restrict product flow if itddecZIarew <br />til <br />Tor -electronic LLDs, does the turbine im �matili shut off if the LLD dde= a leW <br />ja=�.For <br />clec"nic UMs, does the. turbine automatically shut-off if any -portion of the -monitoring, system <br />1 or fails atest? <br />a <br />For electronic LLDs, have all accessible wiring connections been visually iaspci <br />n <br />U222! <br />Were all items on the equipment manuactureesmamtcnance choddist completed? <br />i T a 1IRT,7M t.:\:It <br />UN 5 VJ.Pj <br />IL Comments: <br />