My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_1998-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 1:45:39 PM
Creation date
6/3/2020 9:54:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2004
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_1998-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
777�iMonitoring Sys -ten -i -Certification <br />9 4 Its <br />'M <br />17-1 W-3 It I I Z -7 -MV -5 7777,g Z <br />gair Mj=—Wer�ta-nkia-u-g-ing probes visually inspected for.damage and residue <br />Was acY .. of system, product level readings tested? <br />IqWV_Wj=:I Was accuracy of system water level readings tested? <br />I RK <br />Were all items on the'equipmmtti. nufadfiremaintenanc,-AwMist completed? <br />MA to <br />IL Comments: <br />cc? <br />For equipment start-up or annual - q[uiP`ke7nt certification, was a leak simulated to verify LLD P.rfbrmanis <br />(Check 0 tharapply) Simulated leak ratez 'M 3. g-pJL); Cl 0-1 kp.IL2-, 0 02 &p -h-' <br />-Nottis: L Required for ocltitipmedt start-up cerfificafion and annual certification. <br />-2.'Untess mandated by local agency, certificaton requh-ed only for electronic LLD start-up.. <br />D?q <br />I <br />TotmechanicalLLI)s, does the LLD restrict product flow if itddecZIarew <br />til <br />Tor -electronic LLDs, does the turbine im �matili shut off if the LLD dde= a leW <br />ja=�.For <br />clec"nic UMs, does the. turbine automatically shut-off if any -portion of the -monitoring, system <br />1 or fails atest? <br />a <br />For electronic LLDs, have all accessible wiring connections been visually iaspci <br />n <br />U222! <br />Were all items on the equipment manuactureesmamtcnance choddist completed? <br />i T a 1IRT,7M t.:\:It <br />UN 5 VJ.Pj <br />IL Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.