Laserfiche WebLink
• <br />8. a. Describe the method that will be utilized to purge and/or inert the tank(s): ['j I <br />t' P <br />b. Tank/Piping Hauler: <br />Name . J v /4l <br />Address City <br />Phone No.( ) <br />Hauler Registration # (if hauled as hazardous) <br />C. Tank/Piaing Disuosal Site: <br />Na <br />Zip <br />Address City <br />Zip <br />Phone No.( ) <br />EPA ID# (if transported to a permitted TSD facility) <br />9. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br />10. Describe how the excavation will be backfilled with suitable material upon removal: <br />Q I A <br />11. Handling of excavated soil: - \ I A <br />a) What material will be used to line the tank pit and cover the stockpile? <br />b) What will be the final destination of the excavated stockpile? <br />c) Contaminated Soil \Hazardous Waste Hauler: <br />Name Iu I Hauler Registration # <br />Address City Zip <br />Phone No.( ) <br />EH 23 046 (Revised 9/11/96) Page 5 <br />