My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 1:53:27 PM
Creation date
6/3/2020 9:54:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_2005-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'~. <br />- <br />�lz ������r������ <br />August 23, 2005 <br />John Jackson <br />San Joaquin County <br />Certified Unified Program Agency (CDPA) <br />Environmental Health Department <br />304East Webber Avenue <br />Stockton, CA. Q5202 <br />Re: CONOCOPHILIPS SS# 2611194 <br />2375 N. TRACY BLVD <br />TRACY, CA. <br />[Dear Mr. Jackson <br />Tait Environmental Systems has been asked hoperform repairs and retests onfailed components <br />at the above referenced station from a previous SB -989 test, The components we have been <br />asked to repair is as follows- Dispenser pans 3/4, 5/6, 7/8, and the 89 turbine sump. The scope <br />for repairs is as follows. <br />= Remove dispensers 3/4.B6'and 7/8 from the islands. <br />w Saw -cut and breakout concrete onthe piping side nfeach dispenser pan. <br />° Excavate toexpose product piping. <br />• Cut back primary and secondary product lines outside the dispenser pans. <br />° Furnish and install new Penetration fittings oneach proo|uo\inside each pan. <br />• Extend both primary and secondary product lines back into dispenser pans <br />• Fibm/g|asnthesumpi0008arcmnnecho/`inuideihe89-Lu/binwsuo`pvvi8'6be/y|aso <br />matting and resin. <br />° Perform required testing on the extended primary and secondary lines and the 89 -turbine <br />sump per SB -989. <br />° Backfill with existing backfill material. <br />m Patch back concrete (omatch existing grade, <br />° Reset the three dispensers. <br />Attached you will find certifications and various Cut sheets of parts to be Used for repairs. <br />Feel free to call if you have any questions. <br />VoryTrulyYomrs. <br />TAIT ENVIRONMENTAL SYSTEMS <br />Jason T_ Musial <br />CA L�m#58,8098 ~AZ Li, #V,195984~ N",,.-' #,0104��6, kli <br />18S3mou1 Nevx/v�,,���~ o�an�+.Caxf�rni�9zO8� ^ 7�156�8222 ^ r|��8�O�oa��x <br />a280�axcC�nm, o,/,* ^ 9000^oourx"v�'CaV(mmuyz74z ^ o��8��1080 ^ S��8�8�o�� rox <br />Z00[p] IVINHNN0NIANH 1IV1 TTul8209T6 YVA 9Z:ST S0VJ/JI/60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.