My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 1:53:27 PM
Creation date
6/3/2020 9:54:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_2005-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />The purpose of this Health and Safety Plan (HASP) is to define on-site health and safety roles, health <br />and safety procedures, and discuss chemical and physical hazards, which may be encountered at the <br />project. <br />The elements of the HASP include procedures for personnel protection equipment safety, medical <br />surveillance, air quality monitoring, and general work practices. This plan also details the proper <br />emergency procedures, including emergency response and first-aid capabilities. Compliance with this <br />HASP is required of all workers and third parties who enter the sites while the above work is in <br />progress. <br />uqlmp•• • •. <br />Perform necessary SB -989 repairs. Remove dispensers number 3-4, 5-6 and 7-8 to gain access to <br />pans and replace all piping and electrical penetrations with non split blue line penetrations. Prep and <br />fiberglass the sump to collar connection inside the 89 turbine sump. Upon a succesfull pre-test reset <br />dispensers and perform the necessary SB -989 testing with Mr. Steven Shih of San Joaquin County <br />Env. Health or other designated agency representative. <br />It is important to protect the surrounding environment as it exists around the work area involved. All <br />trees, plants, and shrubs close to the work area will be barricaded if necessary to reduce the risk of <br />damage from construction debris and equipment. All efforts will be made to insure protection of <br />natural resources within the boundaries of the project and within the work area. All demolition and <br />excavation will be limited to the enclosed work area. <br />Dust control measures, in the form of water spray, will be used to prevent dust migration from the <br />excavation site. This is a generally accepted procedure by all Governing Agencies. <br />Generated hazardous waste will be handled and disposed of in Compliance with the following; 40 CFR <br />260, 40 CFR 261, 40 CFR 262, 40 CFR 263, CFR 1910, Title 22 Division 4, Title 23, Cal OSHA, and Cal <br />Haz-Mat Enforcement and Liability. <br />
The URL can be used to link to this page
Your browser does not support the video tag.