My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 1:53:27 PM
Creation date
6/3/2020 9:54:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_2005-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Optional fiberglass coating <br />Optional Bravo's vapor recovery valve <br />Optional vapor recovery valve bracket <br />Optional factory vapor fittinj <br />Optional factory electrical <br />with electrical seal <br />PRODUCT FEATURES: <br />Made to spec for any brand or model of dispenser <br />Low-cost conversion frame allows economical <br />retrofitting, without removing existing Bravo Box or <br />breaking concrete, when dispenser is upgraded. (option - <br />Standard steel frame functions as an anchoring <br />platform and waterguard <br />UL listed powder epoxy coated steel <br />12 -gauge steel <br />Patented <br />IUD <br />BRAY® <br />SYSTEMS <br />STANDARD EQUIPMENT: <br />Patented float -trip shutoff <br />amplification mechanism <br />Product shear valve single <br />poppet <br />Product shear valve bracket <br />Product penetration fittings <br />Powder epoxy coated paint <br />8-3/4" deep <br />Optional double <br />poppet shear valve <br />Optional Flex Boot with <br />bonded FRP ends. Third <br />Parry Approved <br />OPTIONAL EQuipmENT: <br />BFH-3-30FRP-A or S CTC Secondary flex boot <br />with Ameron and A.O. Smith pipe bonded with <br />encapsulated S.S. clamp, factory installed (Third <br />Party <br />B-1 vapor recovery shear valve <br />BRKT-Bl vapor recovery valve bracket <br />FEF -ES -factory electrical fitting <br />with electrical seal <br />FVF-NIP factory vapor fitting w/nipple <br />DPA -double poppet shear <br />valve adder <br />FC -fiberglass coating <br />Field installed vapor and electrical fittings <br />323/888- 133 S. BRAVO SYSTEMS. INC - 2929 Vail Avenue • Commerce - CA - 90040 -PEI. <br />Fax: 323.888.4123 • E-mail: infoasbravo.com http:i/www.sbravo.com , <br />B 2o00.1333 -D50903 <br />
The URL can be used to link to this page
Your browser does not support the video tag.