Laserfiche WebLink
11 <br />LI <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: C1 Piping Nlanufacturer <br />N Industry Standard <br />U Other (Specific) <br />Test .1viethod Used: Pressure L-1 VaCLIUIII <br />F -i r)ti,.., <br />Page <br />of jr <br />C7 Processional Erinneer <br />0 Hydrostatic <br />Test Equipment Used: <br />Equiprnent Resolution: <br />N <br />Piping Run 4 Piping Run 4 <br />Piping Run <br />Piping Run # <br />Piping Material: <br />Piping Manufacturer: <br />Di <br />Pipinc,iameter: <br />Length Piping Run: <br />. .. ...... <br />of <br />Product Stored: <br />'vlet.liod and location of <br />pipin�-ran isolation: <br />Wait time between applying <br />press ure/vac uurn/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Ri): <br />,Test End Time: <br />rr/s, <br />F Final Readin-(Rr): <br />A - <br />Test Duration: <br />Change in Reading (Rt: -Rif: <br />Pass/Fail Threshold <br />ZZ, <br />A/0 V,5� <br />or <br />Criteria: <br />/.;:" <br />Test Result- <br />[% Pass 0 Fail <br />Pass O.Fail <br />0 Pass 0 Fail <br />n Pass El Fail <br />Ing. (71,11 recommended �bflow-upfor failed tests) <br />Comments — (include information on repairs made prior to resL— <br />£002 IVINHWNOHIANH IIVI TTOTS999T6 XVJ 60:9T COOZ/9T/ZO <br />