My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_2013-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 4:22:39 PM
Creation date
6/3/2020 9:54:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2014
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_2013-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page _ of <br />,9 qRCON*nARV PiPF.,rESTYNG <br />Test Method Developed By: X Piping Manufacturer Industry Standard 3 Professional Engineer <br />F Other (Specify) <br />Test Method Used: X Pressure 0, Vacuum Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />W, <br />Piping Run # I Piping Run # 2 <br />Equipment Resolution: 1/10-15 Psi <br />Piping Run # 3 Piping Run # <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Ameron <br />Ameron <br />Ameron <br />Piping Diameter: <br />1 3" <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 114' <br />Approx. 107' <br />Approx. 84' <br />Product Stored: <br />Regular 87 <br />Super 91 <br />Plus 89 <br />Method and location of <br />I piping -run isolation: <br />Test boot at STP#I <br />Test boot at STP#2 <br />Test boot at STP#3 <br />Wait time between applying <br />pressure and starting test: <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />. <br />Test Start Time: <br />12:40 <br />12:45 <br />12:50 <br />Initial Reading (RI): <br />3 Psi <br />3 Psi <br />3 Psi <br />Test End Time: <br />Final Reading (RF): <br />1:40 <br />. .. . .......... <br />3 Psi <br />1:45 <br />. . .... .............. ............. . .......... . ....... <br />3 Psi <br />1:50 <br />... . ..... . . ............. ... .... ... .... ........... ....... ... .. .... <br />3 Psi <br />........... .......... . ... . ............ ............... <br />Test Duration: <br />I Hour <br />I Hour <br />I Hour <br />Change in Reading (Rf.,-R,): <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.