Laserfiche WebLink
SWRCB, January 2002 <br />R. FYIJ, RISER CONTAINMENT SUMP TESTING <br />Page _ of <br />Facility is Not Equipped With Fill Riser Containment Sumps X <br />Fill Riser Containment Sumps are Present, but were Not Tested 0 <br />Test Method Developed By: 0 Sump Manufacturer [] Industry Standard 0 Professional Engineer <br />C Other (Specify) <br />Test Method Used: C1 Pressure 0 Vacuum 0'Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />Sump Diameter: <br />Fill Sump# <br />Fill Sum # <br />FBI Sum # Fill Sump # <br />Sump Depth: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to <br />testing: <br />Portion of Sump <br />Sump Material: <br />Wait time between applying <br />water and startiag_ test: <br />Test Start Time. <br />Initial Reading (R,): <br />Test End Time: <br />Final Reading (Rr): <br />Test Duration: <br />Change in Reading 04-RO: <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />Is there a sensor in the sump? <br />Does the sensor alarm when <br />either product or water is <br />detected? <br />Was sensor removed for tes j'ng9 <br />Was sensor properly replaced and <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />