My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_2013-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 4:22:39 PM
Creation date
6/3/2020 9:54:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2014
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_2013-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r1 <br />LJ <br />Thuy Tran [EH] <br />From: Thuy Tran [EH] <br />Sent: Monday, September 16, 2013 1:41 PM <br />To: 'John Fahy' <br />Cc: Hakam Misson (misson.hakam@gmail.com); Robert Eagan (robert.eagan101@gmail.com) <br />Subject: approval for ELD repairs & ISD upgrades <br />Attachments: 20130916134248848. pdf <br />Attached is the approval letter to make necessary repairs to the UST system that had failed the ELD test. <br />Thuy <br />From: John Fahy[mailto:fahyconstruction(�i)yahoo.com] <br />Sent: Monday, September 16, 2013 12:10 PM <br />To: Thuy Tran [EH] <br />Subject: Veeder Root Monitor system <br />Thuy: <br />Tracy Valero, 2375 N. Tracy Blvd. Tracy <br />Per your request, please include the re -location of the Veeder Root <br />monitor panel from the east side of the existing wall to the west, inside <br />the station which is currently under renovation, on the new work order approval. <br />As we discussed, this work was performed by another contractor on site, <br />at the request of the owner, Hakam Mission. It is my understanding that <br />the work was performed by Wayne of HMC . <br />Fahy Construction Company, Inc. was not aware of this work, nor did we <br />authorize it to be completed. <br />Thank you for your attention to this matter, and we look forward to working <br />with you on the ELD testing repairs at this site. <br />John F. Fahy <br />Fahy Construction Comnpany, Inc. <br />Cell: 925-998-6552 <br />
The URL can be used to link to this page
Your browser does not support the video tag.