Laserfiche WebLink
F� <br />September 11, 2013 <br />Thuy Tran <br />San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue <br />Stockton, CA 95205-6232 <br />FAMY CONSTRUCTION CO. 411 N. Buchanan Circle #2 <br />INC Pacheco, CA 94553 <br />T 925-674-8800 <br />F 925-674.8801 <br />fohyconstruction@yahoo.com <br />Subject: Tracy Valero, 2375 N. Tracy Blvd, Tracy, CA <br />As a result of the ELD testing at the above referenced site, and my discussions with the ELD tester, <br />Sergio Nunez, concerning the results, we have developed a work plan for the additional work to be <br />performed at the site upon your approval: <br />1. Sawcut, jackhammer, and remove concrete around the 89 and 91 tank fill, vapor, and tank gauge <br />risers. Excavated concrete to be removed and disposed. Excavate to tank top and expose risers <br />and the bungs of the tank. Excavated pea gravel to be stockpiled and re -used as backfill. <br />2. Risers to be inspected, removed, cleaned, and re -installed with new pipe dope. <br />3. Excavations and open sump areas to be barricaded and/or flagged for safety purposes. Excava- <br />tions to remain open until next ELD test to assure access for inspection and test. Since the testing <br />agency can only give an approximate area to be inspected, all newly opened fittings and pipe to be <br />inspected for any leaks. <br />4. In addition, 89 tank turbine head to be removed, new seals installed, and vapor poppet valve to be <br />replaced with new. <br />5. For the 87 tank, extractor riser on piping sump extractor to be removed, inspected, and re -installed. <br />In addition, all tank riser caps and adaptors to be inspected, removed, replaced if necessary, and <br />re -installed prior to next test. <br />6. Contractor to be present for next ELD test for any additional minor repairs during pre-test. <br />7_ After completion of the next passing test, excavations to be backfilled and surfaces restored with <br />reinforced concrete, approximately 60 square feet. <br />8. Problem areas have been identified in test results and painted on site for these repairs. However, <br />additional problem areas may be found during this work. These areas will be identified and re- <br />paired as necessary. <br />John Fahy <br />Fahy Construction Company, Inc. <br />