Laserfiche WebLink
San Joaquin <br />DIRECTOREnvironmental® Donna He <br />ran, RENS <br />t It <br />Stockton,CaliforniaPROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kaley Foley, REHS elite: .sj ov.or / <br />1 .2Linda Turkatte, REHS <br />Phone: () 468-3420 Rodney Estrada, REHS <br />August 8, 2013 Fax: (209) 464-0138 Adrienne Ellsaesser, REHS <br />John Fahy Construction <br />411 North Buchanan Circle Suite 2 <br />Pacheco, CA, 94553 <br />Re: ABC Petroleum dba Tracy Valero SR0066437 <br />2375 North Tracy Blvd, Tracy, CA, 95367 <br />The San Joaquin County Environmental Health Department (SJC EHD) is granting a one time <br />180 days extension for the Phase II EVR upgrades for SR0066437. No permit extension request <br />will be allowed after the January 10, 2014 date. No permit fees or addition application needs to <br />be submitted for this extension. <br />If the operator decides to perform Phase II EVR upgrades after the January 10, 2014 date, new <br />application and permit fees must be resubmitted. <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to upgrade EVR/ ISD software, install a carbon canister and perform <br />a cold start on the monitoring panel on the underground storage tank (UST) system at the <br />above noted address. The permit has been approved with the following conditions: <br />Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Thuy Tran at (209) 468-8257 to arrange the following inspection appointments <br />(a 48-hour notice is required for inspection appointments). Please be aware that <br />inspections for emergency work must be scheduled within five days of permit approval. <br />a. Sensor functionality: Functionality of the monitoring system must be verified to <br />ensure that monitoring has been restored to meet the requirements of Title 23 <br />California Code of Regulations and the Health & Safety Code. <br />b. A copy of the alarm history shall be printed prior to performing the "cold start" of the <br />Veeder Root system and made available at the time of EHD inspection. <br />inspection and approval. <br />