My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_2013-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 4:22:39 PM
Creation date
6/3/2020 9:54:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2014
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231897_2375 N TRACY_2013-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Daily Activity Log <br />Job# <br />1 6-12304-14241-8782 <br />Site: <br />Tracy Valero <br />I Client: <br />0 <br />Client Contact <br />0 <br />Site Address: <br />Log Completed <br />By: <br />2375 Tracy <br />Blvd <br />Tracy, CA <br />Contact # <br />0 <br />Sergio L. Nunez <br />GC# <br />Date: Leak/Pass <br />Time <br />ITEM <br />Test <br />Tested Sample ID <br />Concentration: <br />(ug/L - ppm - <br />psig) <br />Description (How collected, Volume Collected,Complete Note <br />9/6/13 0 <br />8:00 <br />ON-SITE <br />ON - <br />SITE <br />ON-SITE ON-SITE <br />ON-SITE <br />ON-SITE <br />9/6/13 0 <br />8:05 <br />note <br />note <br />note note <br />note <br />No contractor on-site <br />9/6/13 0 <br />8:10 <br />note <br />note <br />note note <br />note <br />Tail Gate Safety <br />9/6/13 0 <br />8:11 <br />note <br />note <br />note note <br />note <br />Trailer set up and GC Start-up <br />9/6/13 0 <br />8:24 <br />note <br />note <br />note note <br />note <br />Set-up for core drilling <br />9/6/13 0 <br />8:55 <br />note <br />note <br />note note <br />note <br />Contractor on-site <br />9/6/13 0 <br />9:10 <br />TK's <br />BU <br />1 note <br />note <br />Inoc all tanks with 1 psi of Helium <br />9/6/13 1 a,b,c <br />9:54 <br />TK's <br />BU <br />1 note <br />note <br />All risers into cap in TS leaking <br />9/6/13 1d,e,f <br />10:01 <br />TK's <br />BU <br />ATD note <br />note <br />All ATG caps Leaking left site <br />9/6/13 0 <br />10:39 <br />note <br />note <br />note note <br />note <br />No contractor on-site <br />9/6/13 1 d <br />12:41 <br />89TK <br />BU <br />ATG note <br />100ppm <br />Leak at riser area at ATG or Buckets <br />9/6/13 1 e <br />12:59 <br />91 Tk <br />BU <br />ATG note <br />100ppm <br />Leak at riser area at ATG or Buckets <br />9/6/13 1 g <br />13:01 <br />89TK <br />BU <br />TS note <br />note <br />Leak at Turben Head <br />9/6/13 0 <br />13:05 <br />note <br />note <br />note note <br />note <br />Will continue with VSP install <br />9/6/13 0 <br />13:10 <br />note <br />note <br />note note <br />note <br />ELD well Prox will not be able to be completed today <br />but will complete VSP install, <br />9/6/13 0 <br />13:44 <br />87TK <br />BU <br />TS note <br />note <br />Leak at Unused riser into steel capainted safety orange for identification <br />9/6/13 0 <br />15:22 <br />89TK <br />BU <br />VR Bucket note <br />note <br />Vapor poppet valve need to be replaced on 89 tank <br />9/6/13 0 <br />17:00 <br />VSP <br />note <br />note note <br />note <br />Core Drilling Completed <br />9/6/13 0 <br />17:37 <br />VSP <br />note <br />note note <br />note <br />VSP probe install completed <br />9/6/13 0 <br />17:38 <br />VSP <br />note <br />note I note <br />I note <br />Cap seal VSP and Clean-up <br />9/6/13 0 <br />18:10 <br />note <br />note <br />note note <br />note <br />In addition Vents must be back filled and covered wth appropriate materials. <br />9/6/13 0 <br />19:00 <br />OFF- <br />SITE <br />OFF - <br />SITE <br />OFF-SITE OFF-SITE <br />OFF-SITE <br />OFF-SITE <br />
The URL can be used to link to this page
Your browser does not support the video tag.