My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7272
>
2300 - Underground Storage Tank Program
>
PR0231939
>
COMPLIANCE INFO_1987-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 10:51:15 AM
Creation date
6/3/2020 9:54:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2002
RECORD_ID
PR0231939
PE
2361
FACILITY_ID
FA0002570
FACILITY_NAME
QUIK STOP MARKET #3144
STREET_NUMBER
7272
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
094-040-13
CURRENT_STATUS
01
SITE_LOCATION
7272 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231939_7272 WEST_1987-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST INSTALLATION INSPECTION RECORD <br />FACILITY NAME: 'Doo k ___- C; ADDRESS: <br />FACILITY ID# TANK# UL# TANK MODEL/MATERIAL: <br />CAPACITY: PRODUCT: h R.E.H.S: <br />TNITIAL INSPECTIONS <br />A <br />I <br />3. INSPECTIO/9NB''fN EST OF SECONDARY CONTAINMENT: HOLIDAY: <br />_VACUUM:: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br />P <br />N <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />2636 <br />R <br />T <br />✓-8. <br />0 <br />I <br />2635 <br />(a) (4)) <br />V <br />A <br />9. <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />E <br />L <br />19. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br />D <br />S <br />OVERSPILL PERFORMANCE TEST <br />(CCR <br />2635 <br />(b) (1) (C)) <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />11. <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />(CCR <br />2636 <br />(b)) <br />1 _ <br />1. UST PLANS SUBMITTED/ FEES PAID — (H+S CODE 25287) <br />12.. <br />PIPING SLOPES TO COLLECTION SUMP <br />(CCR <br />2. UST INSTALLATION PLANS APPROVED <br />TNITIAL INSPECTIONS <br />PIPING INSPECTIONS <br />6. <br />3. INSPECTIO/9NB''fN EST OF SECONDARY CONTAINMENT: HOLIDAY: <br />_VACUUM:: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br />2636 <br />(e)) <br />4. PRIMARY TANK TEST: PSI: HRS/MIN: <br />7. <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PEI) I <br />PIPING INSPECTIONS <br />FINAL INSPECTION <br />6. <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) <br />(CCR <br />2636 <br />(e)) <br />14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (c) (2)) <br />7. <br />SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: 1 OTHER: <br />(CCR <br />2636 <br />(e)) <br />n �4L �� <br />✓-8. <br />LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: <br />(CCR <br />2635 <br />(a) (4)) <br />9. <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />PEI <br />19. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br />10. <br />OVERSPILL PERFORMANCE TEST <br />(CCR <br />2635 <br />(b) (1) (C)) <br />21. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br />11. <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />(CCR <br />2636 <br />(b)) <br />1 _ <br />23. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-2636) <br />12.. <br />PIPING SLOPES TO COLLECTION SUMP <br />(CCR <br />2636 <br />(c)(1)) j <br />FINAL INSPECTION <br />COMMENTS <br />EH23-006 9/95 <br />• 10 0 <br />13. PERFORMANCE TEST FOR "ALL" MONITORING PROBES (CCR 2632 (c) (2)) <br />14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (c) (2)) <br />15. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2643 (c) (1)) <br />16. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (g)) i <br />17. BALL FLOAT VALVES INSTALLED <br />18. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (b) (2)) <br />19. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br />20. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (a) (5)) <br />21. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br />22. "C" FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br />23. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-2636) <br />24. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284) <br />COMMENTS <br />EH23-006 9/95 <br />• 10 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.