Laserfiche WebLink
WRITTEN MONITORING 1, • <br />O <br />1wku 1 Aa tL1 ' <br />These written procedures are required by California UST Regulations, Section 2632(d)(1), must <br />be maintained at the UST location at all times, and are a condition of the operating permit. <br />Quik Stop Market #144 <br />7272 West Lane <br />Stockton, California 95209 <br />The gasoline storage and dispensing system at this location consists of two (2) 10,000 gallon and <br />one (1) 8,000 gallon double-wall fiberglass, dry -interstitial, underground storage tanks serving <br />three double -sided multi -product dispensers (MPDS). Product lines are double-wall fiberglass. <br />A. Each tank, product line, and dispenser pan is monitored continuously by probes within the <br />tank annular space, turbine sump, and dispenser pan, respectively. <br />B. The TLS -350 Tank and Line Monitoring System is manufactured by Veeder-Root. Leak <br />conditions trigger visual and audible alarms located on the monitoring system control <br />panel. Turbine shutdown will occur if either power is lost to the control panel or if the <br />turbine sump or dispenser pan probe(s) sense leak conditions. <br />C. The monitor control panel is located in the market backroom. The monitor is placed in <br />test mode daily to check alarm function. Results are recorded on a "Daily Monitoring <br />System Inspection Log". <br />D. Monitoring is the responsibility of Har finder S. & Baljit K. Hundal, Franchisees, or their <br />designated duty clerk. Maintenance of the monitoring equipment is the responsibility of <br />Quik Stop Markets, Inc. Required work will be authorized by Mike Karvelot, Director of <br />Environmental Affairs. <br />E. If an alarm occurs, the Franchisee will immediately contact the Quik Stop Gasoline <br />Department, which will in turn dispatch a qualified service contractor to the site. The <br />service contractor will determine the cause of alarm and advise Quik Stop of site <br />conditions. If an unauthorized release to secondary containment has occurred, action will <br />be immediately taken to implement the attached Written Response Plan. <br />F. The monitoring panel and interstitial probes are checked and certified annually. <br />Preventive maintenance is scheduled annually in conjunction with certification. <br />G. A description of the gasoline system operation and operator's responsibilities are included <br />in the Franchise Agreement. Initial training in operation of the tank system and <br />monitoring equipment is conducted "on the job" under the supervision of Quik Stop <br />personnel. <br />