My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7272
>
2300 - Underground Storage Tank Program
>
PR0231939
>
COMPLIANCE INFO_1987-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 10:51:15 AM
Creation date
6/3/2020 9:54:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2002
RECORD_ID
PR0231939
PE
2361
FACILITY_ID
FA0002570
FACILITY_NAME
QUIK STOP MARKET #3144
STREET_NUMBER
7272
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
094-040-13
CURRENT_STATUS
01
SITE_LOCATION
7272 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231939_7272 WEST_1987-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05/24/2001 09:02 916373 WALTON ENGINEEF& PAGE 02 <br />r <br />ENGINEERING, INC. <br />Michelle Sterni -Le May 24, 2Q01 <br />Michael Kith <br />Satz Joaquin County <br />Environinental Health Division <br />304 E. Weber Ave. <br />Stockton, CA 95202 <br />Re: Quik Stop # 144 <br />7272 West sane, Stockton <br />Dear Michelle & Michael: <br />As you requested in our telephone conversation of 5/22/01, the following is a more <br />detailed description of the new work to be performed at this facility. <br />Our Scope of Work includes the following items: <br />Completely retrim each of the three (3) tanks. <br />Remove the entire concrete tank slab and the pea gravel backfill material over the tanks. <br />Remove the existing turbine sumps that are sandwiched between the flanges of the <br />manways. <br />Install new tank manway gaskets and bolts. <br />Install new fiberglass turbine sump rings onto the tanks. <br />Install new fiberglass turbine sumps. <br />Extend existing ,product and vapor piping through new sumps using new penetration <br />fittings. <br />Install new fill and Phase I vapor risers, with new adaptors, caps and overspill buckets. <br />Reinstall the new drop tubes that were installed in the earlier phase of this project. <br />Provide all testing of the piping and a lake test on the new sumps. <br />Backfill with the existing pea gravel and install a new concrete tank slab. <br />Provide a tank and line precision test. <br />Please let me know if you have any questions or require any additional information. <br />Thank you for your cooperation on this project, <br />Sincerely, <br />WALTON ENGINEERING, INC. <br />144445-- t)4('4_Z1 <br />Richard Walton; <br />Field Supervisor <br />843 Riske Lone, West Sacramento, CA 95691 (916) 372-1888 • Fox 373-1171 <br />Mailing Address; P.O. Box 1025, W6Si Sacramento, CA 95691 <br />
The URL can be used to link to this page
Your browser does not support the video tag.