My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7272
>
2300 - Underground Storage Tank Program
>
PR0231939
>
COMPLIANCE INFO_1987-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 10:51:15 AM
Creation date
6/3/2020 9:54:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2002
RECORD_ID
PR0231939
PE
2361
FACILITY_ID
FA0002570
FACILITY_NAME
QUIK STOP MARKET #3144
STREET_NUMBER
7272
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
094-040-13
CURRENT_STATUS
01
SITE_LOCATION
7272 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231939_7272 WEST_1987-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Option IA Continued. <br />10. Design of double -walled tank and system allows for monitoring of the <br />annular space. <br />A. Nonmotor vehicle fuels - No sticking allowed. <br />B. Motor vehicle fuels - Sticking allowed. <br />1. Striker plates required - See Article 3, Section 2635 <br />11. Double -walled tank and system: <br />A. Releases from primary containers designed to drain to a specific location <br />within the annular space to be detected by a monitoring device or method. <br />i- 12. Any special accessories, fittings, coatings, or linings not inherent within <br />the initial design of the primary container or double -walled underground <br />storage tank: <br />A. Shall be approved by a nationally recognized independent testing <br />organization or <br />B. A demonstration of integrity with the primary container or double -walled <br />underground storage tank shall be required. <br />3. Tanks subject to flotation shall be: <br />A. Weilghted <br />B. Anchored <br />C. Methods specified by manufacturer used. <br />14. Detail ofViank and piping system excavation and cover. <br />15. Detail of piping - cross-sectional and termination. <br />16. Detail of tank - cross-sectional. <br />17. Detail of spill fill box. <br />18. Detail of catchment basins/sumps. <br />k/ -I/ 19. Detail of monitoring equipment as installed. <br />pt�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.