Laserfiche WebLink
r <br /> 0 <br /> WRITTEN MONITORING PROCEDURES <br /> FOR <br /> DOUBLE CONTAINMENT UNDERGROUND STORAGE TANK SYSTEMS <br /> These written procedures are required by California UST Regulations, Section 2632(d)(1),must <br /> be maintained at the UST location at all times, and are a condition of the operating permit. <br /> Quik Stop Market#144 <br /> 7272 West Lane <br /> Stockton, California 95209 <br /> The gasoline storage and dispensing system at this location consists of two (2) 10,000 gallon and <br /> one(1) 8,000 gallon double-wall fiberglass, dry-interstitial, underground storage tanks serving <br /> three double-sided multi-product dispensers (MPDs). Product lines are double-wall fiberglass. <br /> A. Each tank, product line, and dispenser pan is monitored continuously by probes within the <br /> - tank annular space, turbine sump, and dispenser pan, respectively. -- <br /> B. <br /> B. The TLS-350 Tank and Line Monitoring System is manufactured by Veeder-Root. Leak <br /> conditions trigger visual and audible alarms located on the monitoring system control <br /> panel. Turbine shutdown will occur if either power is lost to the control panel or if the <br /> turbine sump or dispenser pan probe(s) sense leak conditions. <br /> C. The monitor control panel is located in the market backroom. The monitor is placed in <br /> test mode daily to check alarm function. Results are recorded on a"Daily Monitoring <br /> System Inspection Log". <br /> D. Monitoring is the responsibility of Har inder S. &Baljit K. Hundal, Franchisees, or their <br /> designated duty clerk. Maintenance of the monitoring equipment is the responsibility of <br /> Quik Stop Markets, Inc. Required work will be authorized by Mike Karvelot, Director of <br /> Environmental Affairs. <br /> E. If an alarm occurs, the Franchisee will immediately contact the Quik Stop Gasoline <br /> Department,which will in turn dispatch a qualified service contractor to the site. The <br /> service contractor will determine the cause of alarm and advise Quik Stop of site <br /> conditions. If an unauthorized release to secondary containment has occurred, action will <br /> be immediately taken to implement the attached Written Response Pian. <br /> F. The monitoring panel and interstitial probes are checked and certified annually. <br /> Preventive maintenance is scheduled annually in conjunction with certification. <br /> --- - - G. A description of the gasoline system operation and operator's responsibilities are included <br /> in.the Franchise Agreement. Initial training in operation of the tank system and <br /> monitoring equipment is conducted "on the job" under the supervision of Quik Stop <br /> personnel. <br /> I <br />