My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7272
>
2300 - Underground Storage Tank Program
>
PR0231939
>
COMPLIANCE INFO_1987-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 10:51:15 AM
Creation date
6/3/2020 9:54:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2002
RECORD_ID
PR0231939
PE
2361
FACILITY_ID
FA0002570
FACILITY_NAME
QUIK STOP MARKET #3144
STREET_NUMBER
7272
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
094-040-13
CURRENT_STATUS
01
SITE_LOCATION
7272 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231939_7272 WEST_1987-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F In-Tank Gauging/SIR ui t: ❑ . <br /> �l P Check this box if tank gauging rs used only for inventory coatroL <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> m fete the following checklist: <br /> LLYC."sm <br /> ❑ No* Has all Mput wring been' far proper entry and termination;mciuding listing for ground faults? - -- <br /> ❑ No* Wein all tank gauging probes visually for damage and residue buildup?-- — -- - <br /> Cl No* Was of system level tested? <br /> ❑ No* Was accuracy of system water level rradings tested? <br /> ❑ No* Were all probes properly? <br /> all items on the equipment manufacturces maintenance checklist completed? <br /> *In the Section H,below,describe how and when theme deficiencies were or will be corn ec&d. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if <br /> 11-Ds are not installed. <br /> -Complete the folio ' the ddist: <br /> O..YCa ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (t:heck aU that apply) Simulated leak rate: W3 g p h.; ❑0.1 g p h; ❑02 g p h. <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LIA restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑'`Yes 0 No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> ❑ Yes ❑ No* For ekxAronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> N/A or fails a test? <br /> ❑ Yes ❑ <br /> rNo* For electronic LLDs,have all accessible wring connections been visually inspected? <br /> Al N/A <br /> Yes . ❑ No* I Were all items on the equipment manufactunst's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: - <br /> Pa-,c 3 of 3 <br /> �,;? ,.. .:+. <br />
The URL can be used to link to this page
Your browser does not support the video tag.