Laserfiche WebLink
UNDER DISPENSER CONTAINMENT (UDC) TESTING <br /> . <br /> Tsf.;Mehad .. 0 Man 1A tutee i:Industry►SlandascE E PrnffQital;Engr C� 4thec(see below) <br /> .. ... ..... . <br /> r:::.:....:::::::::: <br /> TsMeth01 (�e Q Pressure :..:..;.; Uaeudm iHydrbstataF: E (?ttier(see below) <br /> . ....::. . . <br /> Mrea Urrn Egl��l Crrf lrlt ttsed Level Change In ftcat r �ealdw a sys�em 2� ..t... ort En the ..... <br /> testi ion 13Is #'t�2 ate 3f D><s ` f .... <br /> UDC Manufacturer Bravo Bravo Bravo <br /> UDC Material FRP FRP FRP <br /> UDC De th 30" 39' 30" <br /> P (inches) <br /> Height from UDC bottom to highest11" 11" 11" <br /> piping penetration <br /> Height from UDC bottom to lowest 3" 3" 3" <br /> electrical penetration <br /> Condition of UDC riot to testing D D D <br /> P 9 rY Dry Dry <br /> Portion of UDC tested Entire Entire Entire <br /> Type of shut-down resent Sensor Sensor Sensor <br /> YP P <br /> Was sensor removed for testing? Yes Yes Yes <br /> Was sensor properly replaced after testing? Yes Yes Yes <br /> Wait time for water level to stabilize(hr:min) 0:26 0:26 0:25 <br /> e th of water level from UDC bottom in. 15" 15" 15" <br /> ® P ( ) <br /> Test start time <br /> 9:12 AM 9:13 AM 9:14 AM <br /> Test end time 9:42 AM 9:43 AM 9:44 AM <br /> Test duration ) <br /> hr:min 0:30 0:30 0:30 <br /> ( <br /> Change in water level(t 0.000 inches) 0.000 0.000 0.000 <br /> »' Pass/Fail threshold(0.005 inches/Y2 Hr.) 0.005 0.005 0.005 <br /> // <br /> S....."....TESTRESULT PASS PASS <br /> AS <br /> Comments: <br /> 0 2002 Walton Engineering,Inc. <br />