Laserfiche WebLink
e <br /> WRITTEN PROCEDURES&BEST MANAGEMENT PRACTICES <br /> FOR MONITORING <br /> DOUBLE CONTAINMENT UNDERGROUND STORAGE TANK SYSTEMS <br /> Quik Stop Market#144 <br /> 7272 West Lane <br /> Stockton,California 95209 <br /> The gasoline storage and dispensing system at this location consists of two(2) 10,000 gallon and <br /> one(1)8,000 gallon double-wall fiberglass,dry-interstitial,underground storage tanks serving <br /> three double-sided multi-product dispensers(MPDs). Product lines are double-wall fiberglass. <br /> A. Each tank,product line,and dispenser pan is monitored continuously by probes within the <br /> tank annular space,turbine sump,and dispenser pan,respectively. <br /> B. The TLS-350 Tank and Line Monitoring System is manufactured by Veeder-Root. Leak <br /> conditions trigger visual and audible alarms located on the monitoring system control <br /> panel. Turbine shutdown will occur if either power is lost to the control panel or if the <br /> turbine sump or dispenser pan probe(s) sense leak conditions. <br /> C. The monitor control panel is located in the market backroom. The monitor is placed in <br /> test mode daily to check alarm function. Results are recorded on a"Daily Monitoring <br /> System Inspection Log". <br /> D. Monitoring is the responsibility of Balwinder Somal&Surinder Kaur,Franchisees,or <br /> their designated duty clerk. Maintenance of the monitoring equipment is the <br /> responsibility of Quik Stop Markets,Inc. All repairs will be authorized by Mike <br /> Karvelot,Director of Environmental Affairs. <br /> E. If an alarm occurs,the Franchisee will immediately contact the Quik Stop Gasoline <br /> Department,which will in turn dispatch a qualified service contractor to the site. The <br /> service contractor will determine the cause of alarm and advise Quik Stop of site <br /> conditions. If an unauthorized release to secondary containment has occurred,action will <br /> be immediately taken to implement the attached Written Response Plan. <br /> F. The monitor panel and probes are checked and certified annually in August. Preventive <br /> maintenance and spill bucket testing is scheduled annually in conjunction with monitor <br /> certification. SB-989 is conducted tri-annually in December('04, '07,ad infinitum). <br /> G. A description of the gasoline system operation and operator's responsibilities are included <br /> in the Franchise Agreement. Initial training in operation of the tank system and <br /> monitoring equipment is conducted"on the job"under the supervision of Quik Stop <br /> personnel and the Designated UST Operator. <br />