My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7272
>
2300 - Underground Storage Tank Program
>
PR0231939
>
COMPLIANCE INFO_2003-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 10:55:58 AM
Creation date
6/3/2020 9:55:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2007
RECORD_ID
PR0231939
PE
2361
FACILITY_ID
FA0002570
FACILITY_NAME
QUIK STOP MARKET #3144
STREET_NUMBER
7272
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
094-040-13
CURRENT_STATUS
01
SITE_LOCATION
7272 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231939_7272 WEST_2003-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY LINE TESTING <br />Test Method By: o Manufacturer <br />Test Method Uses: • Pressure <br />Measuring Equipment Used: <br />• Industry Standard o Professional Engr o Other (see below) <br />o vacuum o Hydrostatic o Other (see below) <br />Pressure Gauge (range Oto 15 psig) <br />Description <br />Line #1 <br />Line #2 <br />Line #3 <br />0:05 <br />1:53 PM <br />Tank product <br />Gasoline - 87 <br />Gasoline - 89 <br />Gasoline - 91 <br />5.0 <br />Test end time <br />Pipe manufacturer <br />Smith <br />Smith <br />Smith <br />5.0 <br />5.0 <br />Pipe material <br />FRP <br />FRP <br />FRP <br />1:00 <br />pipe isolation <br />Primary pipe diameter (inches) <br />2" <br />2" <br />2" <br />80' <br />90' <br />Secondary pipe diameter (inches) <br />3" <br />3" <br />3" <br />PASS <br />Method of secondary pipe isolation <br />Termination Boot <br />Termination Boot <br />Termination Boot <br />Location of secondary <br />Comments: <br />Wait time for pressure to stabilize (hr:min) <br />Test start time <br />0:05 <br />1:46 PM <br />0:05 <br />1:53 PM <br />0:05 <br />2:44 PM <br />Initial pressure (psig) <br />5.0 <br />5.0 <br />5.0 <br />Test end time <br />2:46 PM <br />2:53 PM <br />3:44 PM <br />Final pressure (psig) <br />5.0 <br />5.0 <br />5.0 <br />Test duration (hr:min) <br />1:00 <br />1:00 <br />1:00 <br />pipe isolation <br />Sump <br />Sump <br />Sump <br />Estimated length of piping run (feet) <br />80' <br />90' <br />70' <br />(include length of branch runs) <br />PASS <br />PASS <br />PASS <br />Comments: <br />Wait time for pressure to stabilize (hr:min) <br />Test start time <br />0:05 <br />1:46 PM <br />0:05 <br />1:53 PM <br />0:05 <br />2:44 PM <br />Initial pressure (psig) <br />5.0 <br />5.0 <br />5.0 <br />Test end time <br />2:46 PM <br />2:53 PM <br />3:44 PM <br />Final pressure (psig) <br />5.0 <br />5.0 <br />5.0 <br />Test duration (hr:min) <br />1:00 <br />1:00 <br />1:00 <br />Change in pressure (psig) <br />0.0 <br />0.0 <br />0,0 <br />Pass/Fail threshold (psig) <br />0.5 <br />0.5 <br />0.5 <br />TEST RESULT <br />PASS <br />PASS <br />PASS <br />© 2004 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.