Laserfiche WebLink
SWRCB, January 2002 <br />i <br />9. SPIT.T./OVF.RFTT.I. (nNTAINMV.NT RnYV.-C <br />Page of <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />N Spill Bucket Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure ❑ Vacuum ❑ Hydrostatic <br />�d Othgr (Spec) , <br />Test Equipment Used: H <br />Bucket Diameter: <br />(4) 1� <br />Spill Box # Spill Box # <br />Equipment Resolution: <br />Spill Box # Spill Box # <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />L� <br />Initial Reading (R,): <br />Test End Time: <br />19.n` <br />Final Reading (RF): <br />1 <br />Test Duration: <br />f <br />1-� <br />Change in Reading (RF -R,): <br />s <br />Pass/Fail Threshold or <br />Criteria: <br />-. <br />1041 ft-Ri 1. s n,iX <br />€, �+ <br />Comments — (include information on repairs made prior {o testing, and <br />