My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7272
>
2300 - Underground Storage Tank Program
>
PR0231939
>
COMPLIANCE INFO_2003-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 10:55:58 AM
Creation date
6/3/2020 9:55:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2007
RECORD_ID
PR0231939
PE
2361
FACILITY_ID
FA0002570
FACILITY_NAME
QUIK STOP MARKET #3144
STREET_NUMBER
7272
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
094-040-13
CURRENT_STATUS
01
SITE_LOCATION
7272 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231939_7272 WEST_2003-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY LINE TESTING <br /> Test Method By: O Manufacturer • Industry Standard o Professional Engr o Other(see below) <br /> Test Method Uses: 0 Pressure o vacuum o Hydrostatic o Other(see below) <br /> Measuring Equipment Used: Pressure Gauge (range 0 to 15 psig) <br /> Description Line#1 Line#2 Line#3 <br /> Tank product Gasoline-87 Gasoline-89 Gasoline-91 <br /> Pipe manufacturer Smith Smith Smith <br /> Pipe material FRP FRP FRP <br /> Primary pipe diameter (inches) 2 2 2 <br /> Secondary pipe diameter (inches) 3 3 3 <br /> Method of secondary pipe isolation Termination Boot Termination Boot Termination Boot <br /> Location of secondary pipe isolation Sump Sump Sump <br /> Estimated length of piping run (feet) 80 90 70 <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize (hr:min) 0:05 0:05 0:05 <br /> Test start time 8:30 AM 8:33 AM 8:36 AM <br /> Initial pressure (psig) 5.0 5.0 5.0 <br /> Test end time 9:30 AM 9:33 AM 9:36 AM <br /> Final pressure(psig) 5.0 5.0 5.0 <br /> Test duration (hr:min) 1:00 1:00 1:00 <br /> Change in pressure (psig) 0.0 0.0 0.0 <br /> Pass/Fail threshold (psig) 0.5 0.5 0.5 <br /> TEST RESULT PASS PASS PASS <br /> Comments: <br /> 0 2006 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.