My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7272
>
2300 - Underground Storage Tank Program
>
PR0231939
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 12:51:19 PM
Creation date
6/3/2020 9:55:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0231939
PE
2361
FACILITY_ID
FA0002570
FACILITY_NAME
QUIK STOP MARKET #3144
STREET_NUMBER
7272
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
094-040-13
CURRENT_STATUS
01
SITE_LOCATION
7272 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231939_7272 WEST_2008-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> I. Site map enclosed? YES[] N0 <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the"Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> fc:Ic TLI <br /> SL <br /> CM- <br /> i <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party i <br /> p rty approval): <br /> lr <br /> e <br /> l <br /> t <br /> 1 <br /> i <br /> I <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.