My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7272
>
2300 - Underground Storage Tank Program
>
PR0231939
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 12:58:25 PM
Creation date
6/3/2020 9:55:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231939
PE
2361
FACILITY_ID
FA0002570
FACILITY_NAME
QUIK STOP MARKET #3144
STREET_NUMBER
7272
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
094-040-13
CURRENT_STATUS
01
SITE_LOCATION
7272 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231939_7272 WEST_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANNUAL SPILL CONTAINER TEST REPORT <br /> TEST DATE: Jul 23, 2018 <br /> Al. FACILITY A2. OWNER <br /> Name Quik Stop Market#144 Name Quik Stop Markets, Inc. <br /> Address 7272 West Lane,Stockton,CA 95210 Address 4567 Enterprise Street,Fremont,CA 94538 <br /> Phone# 510-657-8500 Phone# 510-657-8500 <br /> Contact Roger Batra Contact Debbie Markovich <br /> A3. C U P A A4. TESTING CONTRACTOR <br /> Name San Joaquin County Environmental Health Name Walton Engineering, Inc. <br /> Address 1868 E.Hazelton Avenue,Stockton,CA 95202 Address P.O.Box 1025,W.Sacramento,CA 95691 <br /> Notified July 10,2018 Lic# 617238 A,B,Haz <br /> Inspector Stacy Rivera Contact Veronica Freitas <br /> Phone# 209-468-3442 Phone# 916-373-1166 <br /> �WNWV4 MW <br /> K. SPILL CONTAINER TEST RESULTS <br /> Measuring Equipment Used: Lake Test <br /> Tank Number 1 2 3 <br /> Product contained 87 89 91 <br /> Spill container capacity (US gallons) 5 5 5 <br /> Spill container manufacturer OPW OPW OPW <br /> Spill container depth (inches) 15.25 14.50 15.25 <br /> Is the spill container located in a sump? Yes Yes_ Yes <br /> Does sump have a liquid sensor installed? No No No <br /> Condition of spill container prior to testing Dry Dry Dry <br /> Portion of spill container tested Entire Entrie Entire <br /> Depth of water level from bottom (inches) 13.75 14.00 13.75 <br /> Wait time for water level to stabilize (hr:min) 0:05 0:05 0:05 <br /> Test start time 10:19 10:19 10:19 <br /> Test end time 11:19 11:19 11:19 <br /> Test duration (hr:min) 1:00 1:00 1:00 <br /> Change in water level (±0.000 inches) 0.000 0.000 0.000 <br /> Pass/Fail threshold (0.005 inches/1/2 Hr.) 0.005 0.005 0.005 <br /> TEST RESULT PASS PASS PASS <br /> L. COMMENTS: <br /> wALTON <br /> Signature: ' ENGINEERING,INC. <br /> Technician: Nick Janoe B49017/8712764 Date: j1d y 23, 2018 <br /> 0 2018 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.