My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7272
>
2300 - Underground Storage Tank Program
>
PR0231939
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 12:58:25 PM
Creation date
6/3/2020 9:55:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231939
PE
2361
FACILITY_ID
FA0002570
FACILITY_NAME
QUIK STOP MARKET #3144
STREET_NUMBER
7272
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
094-040-13
CURRENT_STATUS
01
SITE_LOCATION
7272 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231939_7272 WEST_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• t -%1-n Ian <br />MONITORING SYSTEM CERTIFICATIO "- jUL 26 2016 <br />CERTIFICATION /TEST DATE: Jul 23, 2018 <br />rv°Nli/q ,.,r. .. <br />A1. FACILITY <br />Name Quik Stop Market #144 <br />Address 7272 West Lane, Stockton, CA 95210 <br />Phone # 510-657-8500 <br />Contact Roger Batra <br />A2.OWNER <br />Name Quik Stop Markets, Inc. <br />Address 4567 Enterprise Street, Fremont, CA 94538 <br />Phone # 510-657-8500 <br />Contact Debbie Markovich <br />F. IN -TANK GAUGING / SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes <br />❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ Yes <br />❑ No* Were all probes reinstalled properly? <br />❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />■ Yes <br />❑ No* <br />❑ N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br />■ Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />■ Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />■ Yes <br />❑ No* <br />❑ N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ Yes <br />❑ No * <br />■ N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ Yes <br />❑ No* <br />■ N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? <br />?, <br />❑ Yes <br />❑ No* <br />■ N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />or fails a test? <br />❑ Yes <br />❑ No* <br />■ N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />z <br />F ■ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. COMMENTS <br />® 2018 Watton Engineering, Inc. <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.