My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1987 PRECISION TESTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_1985-1987 PRECISION TESTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 11:02:44 AM
Creation date
6/3/2020 9:55:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1987 PRECISION TESTS
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_1985-1987 PRECISION TESTS.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br /> i <br /> GARY PETERS ENTERPRISES <br /> 11388 COLOMA RD. —7 <br /> Rr-"CHO CORDOVA, CA. 95,670 <br /> 916-738-7198 <br /> REPORT OF HELIUM TEST <br /> TANK #879-G2U1 <br /> SITE 3100 <br /> DATE OF TEST : 2-18-89 <br /> The purpose of the test via.s to identify a.ny leaks. i n the <br /> product line . Product in this tank is unleaded gasoline . The <br /> plug in the leak detector, fitting was removed and all fluid in <br /> the pipe system; pumped out . The plug was reinstalled and sealed. <br /> The test plug in the impact valve (under the unleaded dispenser ) <br /> was removed and fittings installed to accept a pressure guage and <br /> Helium supply line fitting. The cap on the tape guar <br /> e riser (on <br /> the tank:) was removed to vent the tank. . Helium was injected into <br /> the tank with the regulator set at 2 psi . The pipe sy=_•tem did <br /> pressurize rapidly. The supply was cut off and a slight decay in <br /> pressure was observed. The Helium supply was turned back on and <br /> allowed to sustain the 2 psi setting. The tank opening was <br /> tested for the presence of Helium with none detected. The check <br /> valve was determined to be sealing the pipe system off from the <br /> tank . Since the check valve was holding pressure , it was decided <br /> that the Helium pressure could be increased . The regulator was <br /> adjusted to 5 psi . During this time , the Helium detector was <br /> being used to survey the area for any leaking Helium. Mone was <br /> found during repeated tests at various locations. Helium still <br /> was not detected in the tank ( indicating the check valve still <br />
The URL can be used to link to this page
Your browser does not support the video tag.