My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1987 PRECISION TESTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_1985-1987 PRECISION TESTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 11:02:44 AM
Creation date
6/3/2020 9:55:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1987 PRECISION TESTS
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_1985-1987 PRECISION TESTS.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
879-G2U1, respectively. Both of these systems are monitored by <br /> the requirements of Alternative 5: daily inventory reconciliation, <br /> annual tank testing, and continuous operation of pipeline leak <br /> detectors. Systems 879-GlUl and 879-G2U1 are not presently <br /> equipped with pipeline leak detectors. Installation is expected <br /> in early 1989 . <br /> Reconciliation of the daily input with daily withdrawal data for <br /> system 879-GlUl shows 4 quantity variations to exceed allowable <br /> limits. For system 879-G2U1, reconciliation of daily input with <br /> daily withdrawal data shows 12 quantity variations to exceed <br /> allowable limits. Allowable limits are calculated from the <br /> Inventory Reconciliation Sheet submitted by your office. <br /> Tables 1 and 2 summarize the daily variations of fuel quantity <br /> measurements of systems 879-GlUl and 879-G2U1, respectively, that <br /> exceeded the allowable limits. The plus signs associated with <br /> the values of the tables' fourth column numerically refer to the <br /> fuel product volume difference between Actual Variation and <br /> Allowable Variation. In all cases, this fuel product volume <br /> difference infers that the underground storage tanks contained <br /> more fuel than was measured. A review of measuring equipment and <br /> inventory reconciliation procedures is currently being evaluated. <br /> The Inventory Reconciliation Quarterly Summary Report Form is <br /> attached for your records. The form was included in your letter <br /> dated August 3, 1988, which pertained to the Site 300 facility <br /> underground storage tank compliance review. In addition, the <br /> enclosed letter, from Gary Peters Enterprises, provides tank test <br /> results which show tank systems 879-GlUl and 879-G2U1 did pass the <br /> precision tests performed on June 19, 1988. <br /> If you have any questions regarding this report, please contact <br /> Connie DeGrange at (415) 422-5167. <br /> Sincerely, <br /> 2 Irl <br /> Richa C. Ragaini ' <br /> Department Head V <br /> Environmental Protection Department <br /> attachment <br /> cc: E. Draney, L-871 M. Kamiya, DOE-SAN <br /> C. DeGrange, L-193 EPD:Underground Tanks/1048-89 <br /> J. Cullen, DOE-LSO <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.