Laserfiche WebLink
tq°VR p <br /> 0 STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD w 4 s <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B ��� ji <br /> Ao <br /> COMPLETE A SEPARATE FORM FOR E2 TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANE LY CLOSED SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE 8 TANK RE OVED t✓ <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 1�dw <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNK OWN J <br /> A. OWNER'S TANK I.D.n B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) D. TANK CAPACITY IN GALLONS: 00 <br /> II.TANK ONTENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C 1a REGULAR ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY PRODUCT1 UREMIDUM ❑ED 4 GASAHOL <br /> ❑ ❑ 7 METHANOL <br /> UNLEADED ❑ 5 JET FUEL <br /> F—] 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ DOUBLE WALL F—] 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM `iF' 2 SINGLE WALL [:j4 SECONDARY CONTAINMENT (V LTED TANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 XY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR <br /> ❑ 5 GLASS LINING ❑ 6 UNLINED95 UNKNOWN ❑ 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING INYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTHIFAPPLICA13LE <br /> SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN <br /> A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 IMONRORI A ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERT MAT <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY OWLEDGE, IS TRUE AND CORRECT <br /> APPLICANT'S NAME / <br /> DATE <br /> (PRINTED&SIGNATURE) rf 1T/J <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF E FOUR NUMBERS BELOW G✓ <br /> r /�/ COUNTY# JURISDICTIO FACILITY# TANK# <br /> STATE I.D.# �`�/ v D <br /> lllqlo�7 Fol000lir <br /> PERMITNUMBER :2Rg APPRO /D TE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED43Y MIT APPLICATION:rORMAUNLE S A CURRENT FORM A HAS BEEN FILE <br /> FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TAN ONS <br /> FORM B (12-91) � cif � FOR00346-R6 <br />