Laserfiche WebLink
Western Operations <br /> 1252 Quarry Lane <br /> P.O. Box 9019 Clayton <br /> Pleasanton, G 94566 <br /> (510)426-2600 ENVIRONMENTAL <br /> Fax(510)4260106 CONSULTANTS <br /> March 18, 1994 <br /> Mr. Marion Heaton <br /> LAWRENCE LIVERMORE NATIONAL LABORATORY <br /> P.O. Box 808, L-633 <br /> Livermore, California 94550 <br /> Clayton Project No. 38641.00 <br /> Subject: Tank Integrity Testing Results <br /> Dear Mr. Heaton: <br /> Clayton Environmental Consultants, Inc. is pleased to report the results and observations of <br /> the tank integrity tests recently completed at: <br /> Lawrence Livermore National Laboratory <br /> Building 865 <br /> Livermore. California <br /> The tank was tested on March 16. 1994. using the Horner EZY-CHEK tank testing system. <br /> The results of the tests are provided below. <br /> Capacity Results <br /> Tank (Gallons) Product Level (GaVHr) <br /> 865-D 1 U 1 4,000 Diesel High -0.0108 <br /> GPH @ 95% confidence of <.1 as accepted by the State of California and the <br /> Environmental Protection Agency. <br /> The tank was shown to be "product tight." <br /> ACTI V E13864100R.077 <br /> Clayton Environmental Consultants,Inc. Detroit New York/Newark Atlanta San Francisco Los Angeles <br /> Honolulu + Windsor,ON . Toronto • Birmingham,U.K. London.U.K. SouthamDton.U.K. Gateshead.U.K. <br />