Laserfiche WebLink
The LLNL site is secured from the surrounding vicinity with a fence <br /> to eliminate accidental contact from the public. The excavation and <br /> stockpiled soil will be secured with barricades and CAUTION tape <br /> for the protection of LLNL personnel. Stockpiled soil will be stored <br /> on and covered with polyethylene sheets to prevent any liquid runoff <br /> from potentially contaminated soil during rainfall. <br /> Equipment Failure <br /> The SSO must be notified of any equipment failure and will <br /> determine the effect of this failure on tank removal operations. If <br /> the failure prevents the safe implementation of the closure plan, all <br /> personnel will discontinue work and decontaminate themselves <br /> while the situation is evaluated. <br /> PERSONAL PROTECTION EQUIPMENT (PPE) <br /> Work will be performed in PPE listed below unless site conditions <br /> warrant an upgrade of PPE. If an upgrade of PPE is ordered by the <br /> SSO, this SHASP will be amended by the SSO to address the <br /> additional health and safety concerns. PPE equipment will consist <br /> of the following: <br /> • Hard hat <br /> • Eye protection (when required by the SSO) <br /> • Work uniform (chemical-resistant suit when required by SSO) <br /> • Chemical-resistant or work gloves <br /> • Chemical-resistant steel-toed boots (when required by SSO) <br /> • Ear protection (when required by the SSO) <br /> D-11 <br />