My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 11
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_FILE 11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2022 2:48:03 PM
Creation date
6/3/2020 9:55:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 11
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231945_15999 W CORRAL HOLLOW_FILE 11.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/15/03 08:46 FAX 925 422 2748 EPD / WGMG 01013 <br />WRI <br />TTEN MONITORING AND RESPONSE. PLAN <br />:UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information in.this monitoring program are conditions of the <br />operating permit. Lawrience Livermore National. Laboratory (LLNL) Experimental,Test Site 3W(Site 300) must notify the San. Joaquin <br />County Environmental Health Department, (209) 468-3420, within 30 days of any changes to the monitoring procedures, unless required to <br />obtain the approval bam making the change. Required by CCR 2632 (d) and 2641 (h). <br />FACILITY NAME LLNL Sic 300 879-D1111,379-G30 DATE: 7/29,1D3 <br />FACILITY ADDRESS Corr_blow Road south of Tracy. Calif Mi <br />1. Name(s) and Title(s) of the people responsible for performing the monitoring and/or maintenance. <br />A.current contact list is posted at Building 879 with this Monitoring Program (see attached). <br />2. Describe the frequency of performing the monitoring for: . <br />TANKS - Continuous electronic interstitial monitoring PIPING Continuous electronicmonitoring of the <br />underground,.piping at the piping sump.. <br />3. Describe the.location(s) of where the monitoring will be, performe& ie.-location of sensors <br />See attached facility and UST plot plans. <br />4. Describe the following equipment for each underground storage tank. <br />Name and Model of Monitoring Panel CillbArco PM <br />Name and Model of bine Leak Detectors 879-[:3iTt Red Jacket XU879-D U1-Not anpIieable <br />Name and Model of Annular Sensors Gilbar6o, Model 420 - - <br />Name and Model of Piping Sensors Qilbarco Model 205' <br />Name and Model of Dispenser Sensors None <br />Type of ovell prevention Mechanical overfill <br />5. Do the Turbine Sensors and Dispenser.Pan Sensors shutdown the turbine?* Yes -0 No ❑ NA ❑ <br />Does the turbine shut down if a sensor is disconnected? - 879-G3Ul Yes E No ❑ : NA 11 <br />Does the turbine shut down if a sensor is disconnected? - 879-D1Ui ' Yes ❑ Na ❑ NA <br />Does the turbine shut down if the monitoring panel loses power? -= 879-03U1 Yes No D NAD <br />Does the turbine shutdown if the.monitoring panel loses power? — 879-DIU1 . Yes ❑ No ❑NA <br />* The Pan Sensor is a mechanical float; it does not shat down the turbine. This is not applicable to 879-D1U1. <br />6.. How will the alarm history and subsequent maintenance be recorded? <br />An alarm history is maintained by the Gilbarco system and can be printed out at the control panel. Inspections; . <br />maintenance activities (including annual maintenance and certification), alarms, and response are documented in the 879 <br />Logbook located at the monitoring system control panel. In the event of a release, the information required in 23 CCR <br />2651will be entered in the logbook when applicable. <br />7. Maintenance of the monitoring equipment must be performed at least once every 12 months. Describe the <br />preventive maintenance schedule and recording for the .monitoring equipment. What month will annual <br />monitoring certification be performed in? <br />Annual maintenance and certification occurs in October. A line tightness test of the double wailed pressurized pipe . <br />(879-G3U1) also occurs:annually. During the annual maintenance and certification, the in -tank magnetostrictive probe, <br />the tank interstitial space sensor, and the piping sump sensor are removed and inspected. for evidence of damage or.. <br />deterioration, and tested to verify that they operate and trigger an alarm: Monitoring equipment is maintained as needed,' . <br />and is annually certified by and independent contractor to be in. proper operating condition according to manufacturer's <br />specification. LLNL Industrial Electronics personnel may also perform additional inspection and testing. <br />Documentation is recorded in the logbook (see item #6) and on the Monitoring System .Certification form submitted to <br />the County. <br />Note: For new installations the secondary containment must be tested 6. months. after installation. All secondary containment systems . <br />must be tested once every 36.months with initial testing performed before January 1, 2003- <br />L of 6 7/29/03 sb <br />UST Monitoring Program 87879-G3111, 879'-D1U] <br />
The URL can be used to link to this page
Your browser does not support the video tag.