Laserfiche WebLink
Dec 12 02 10:10a <br />Jai Carpenter <br />[510) 278-9137 <br />E <br />a Page Lt_ of 7 <br />SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Tett Method I)eveloped lly: 9Swnp Manufacturer (3 Industry Scmdard n Professional 11nginres <br />0 Other (Specify) <br />Test Method Used: 0 Pressure 0 Vacuum ['Hydrostatic <br />0 0d1B' Awcify) <br />Test Equipaz tt Used: tquiptnent Resolution: <br />C9mmeo;ls — (i.cIude inJo,_wiorr on repairs ►+rade prior to testis and recommerededfolkwu- Wjorjailed rests) <br />pocify how much was testal. if the answer to any of the questions indicated with an <br />` if dee entire depth of the sump isnot tested, x <br />asterisk (•) .s " W or "NA", the entire sump mint be tested_ (.See swRCR tG-160) <br />8it?d WdOT:80 ZOOZ TT 'OaC SZTO+T£t+SZ6 : 'ON 31,101 -Id AMS : bWd <br />sump 0 <br />Sump M Swap # Sump # <br />Sump Diameter: <br />4/ � : j <br />Sutrtp <br />$utanp I++or3;,f,i: <br />�: b e!2214 s <br />Height from Tank Top to Top of <br />Ili pi m Pernetmtion: <br />3 <br />Hai& from "=k. Top to Lowest <br />Eleefticai ftca ration: <br />Condition of .,jmp prior to testing: <br />o ,-,, <br />Portion- of St trnp Tested` <br />! ' <br />Does turbine. shut down when <br />sump samot, detects liquid (both <br />$rYes 0 No 0 NA <br />[:t Yes 0 NO D NA 0 Yes 0 No 0 NA 0 Yes ❑ No 0 NA <br />�odtmt and water)?• <br />Turbine shuuiown response time <br />Is system p�riWattmed for fail-safe ' D Yes ONO 0 NA <br />O Ycs ONO L NA n Yes 0 No .:INA 0 Yes C No ONA <br />shutdown? <br />Was fail-saft Verified to be <br />Oyes ONO DNA <br />Oyes ONo nNA OYes ONO DNA 0Yes 0 N ONA <br />operationair <br />Wait time be tiween ying <br />pressVrelvacte and starting <br />lt'! %� <br />Test Start Tarte: <br />Initial Reading M): <br />t <br />Ter End Tra)e: <br />J •C? �' <br />Final Rea6ig, (Rr•). <br />/ y <br />Test Durarix�r <br />9-a NP9 <br />Change in Ftezading M_Ril:40 <br />pass/Fail Tireshoid or Criteria: <br />1 <br />Test Resins: ' <br />l�: Pass - a Fail. <br />[I:Psls. D.Faii . D Paas ' D Fast '• :., :i7. Pana b:Fa�: r: <br />or <br />Was sestsw-rennoved ftesting? <br />% Yes U No ❑ NA <br />0 Yes 0 No 0 NA 0 Xes D No ONA 0 Yes ❑Ano CNA— <br />Was seeusur taoperly rcptaoed and <br />D Yes 0 No D N.A <br />D Yes 0No ONA pYes ❑ No ONA ❑Yes f1No ONA <br />verified functional after testin ? <br />C9mmeo;ls — (i.cIude inJo,_wiorr on repairs ►+rade prior to testis and recommerededfolkwu- Wjorjailed rests) <br />pocify how much was testal. if the answer to any of the questions indicated with an <br />` if dee entire depth of the sump isnot tested, x <br />asterisk (•) .s " W or "NA", the entire sump mint be tested_ (.See swRCR tG-160) <br />8it?d WdOT:80 ZOOZ TT 'OaC SZTO+T£t+SZ6 : 'ON 31,101 -Id AMS : bWd <br />