Laserfiche WebLink
879-G3U1 annual line leak test Page 1 of 1 <br />Steven Shih [EH] <br />From: Shari Brigdon [brigdonl@llnl.gov] <br />Sent: Monday, December 01, 2003 3:13 PM <br />To: Steven Shih [EH] <br />Cc: morales4@llnl.gov; hoppes1 @Ilnl.gov; schwartz5@llnl.gov; folksl @Ilnl.gov; chase9@llnl.gov; Vijay K. Mishra <br />Subject: 879-G31.11 annual line leak test <br />Steven, <br />The annual line tightness test for 879-G3Ul, required by 23 CCR 2636 (f)(4), is scheduled for Monday, <br />December 8, 2003. LLNL has made arrangements for Afford -A -Test to conduct the test, which will begin <br />between 9 - 9:30 AM. Test duration is expected to be approximately 3.5 hours. Test results will be forwarded <br />to you upon completion. <br />This email is to confirm our phone conversation on 12/1/03 that you do not need to witness this test. <br />Regarding the line leak detector test, the purchase order has been approved and the contractor, DCM Inc., has <br />been contacted to schedule a date. LLNL is waiting to hear back from DCM for scheduling. YI will notify you <br />of the test date as soon as I know it. During the 12/1/03 conversation you stated that if no problems are found <br />with the Red Jacket line leak detector, you do not need to come out. However, if a problem is found, you wish <br />to be notified. If the Red Jacket needs to be repaired or replaced, a permit is required from your office prior to <br />the work being done. You also confirmed that you have not yet heard back from the State Water Resources <br />Control Board regarding acceptability of the leak detector test method used by Brian Thornton of Thornton & <br />Sons. <br />If you have any questions, please call me at (925) 423-7665. <br />Shari Brigdon <br />Environmental Protection Department <br />Lawrence Livermore National Laboratory <br />PO Box 808, L-627 <br />Livermore, CA 94551 <br />Phone: 925-423-7665 <br />Fax: 925-422-2748 <br />email: brigdonl@llnl.gov <br />12/1/2003 <br />