Laserfiche WebLink
i 0 <br /> SVtYItCB,January 2002 Page L of 7 <br /> 6. PIPING SUMP TESTING <br /> Teit Method Developed By: U SUMP Manufacturer U Iudusriy Standard /(Professional Migineer <br /> U Other A edify) V \ <br /> Test Method Used: U Pressure U Vacuum gdroataric <br /> U Otba(SPedfY) <br /> 'FesEFgtaipmeartLtsed: La tcl wc{ eV-eGI�c,� a A,1 4,k4 V- <br /> Egoipment7utiol <br /> :lc�, <br /> Stnmp#1- Stamp# -2 Sump Sip# <br /> SUMPMateriak t=E Lass <br /> Height f[OmTank Top to Top of <br /> Penetration: <br /> Height from Tank Top to Lowest <br /> Elect of Penetration: 5 ° 23" <br /> Condition of sump prior to ted ' 1J r 17 r <br /> Portion of Sump Tested' wq,l-erLe,�1 .'/ W (ea-l-eweLl'1' <br /> Does turbine i0i down when es UNo U NA <br /> Sump sensor detects hVi(bob U Yes )(No UNA U Yes No U NA Uy <br /> U No UNA <br /> duct and water 7"' <br /> Tutbide shutdown response time 5�G-, i,/ A- <br /> Is systemProgrammedfor fair--safe KYes U No U NA <br /> ? <br /> U Yes UNo kXA U Yes j No UNA U YeE U NO UNA <br /> Vas fail safe t►et fned to be <Yej UNo U NA <br /> q U Yes U NO 9Q XA ' U Yes J No .0 NA U Yes UNo U NA <br /> Wait time betweea0starting pressprelvacuuml, <br /> test: 10 Mn <br /> Tiast Start Time: l U!U (v�, 0 . <br /> Instill Reaft(ltd �c✓ Gr t�, �-rv;�- <br /> Test End Time: <br /> Anel P'S5 4Gn�c. frruCJ2 <br /> Test Dmfibw3 wl w 5d Wt <br /> Change is B (1tr-Rn? iv v V�v <br /> Pssa/Faih ThreshoW or Criteria: { C,rrzt,c ;.� o nar„ tC,rvr to c n3 w. <br /> % <br /> Was sensor removed for testing? D Yea UNo U NA es UNo UNA U Yes No U NA U Y UNo UNA <br /> et�ified ftmctional sari Yes U o U NA <br /> IqKYes UN6 UNA U Y UNo UNA U Y U No UNA <br /> Comments- iZr Ennadm on madeEdMfomdbMmrdrerxih olinrrL or tests <br /> 1f the entire depWof the sump is not tested,specify how much was tested. If the answer to agy of the questions indicated with an <br /> asterisk(*)is`NW or"NA",the entire sump must bo twwd. (SegSWIZCB LG-160) <br />